Item No.
Potential Hazard
Likelihood (1-5)
1 = Extemely serious
5 = low risk
Impact on filming (1-5)
1 = Stop Filming
5 = Continue Filming
Rating (low, moderate or high)
Producer’s Risk Strategy/ Further action needed
1
Scene structure not going in order
4
3
Moderate
Follow the plan in pre-production as much as we can
2
Crew members may trip or fall over a branch, rock etc in the park
3
2
High
Check the location where we are going to film so nothing is obstructing us
3
Weather may cause a slippery surface
4
3
Moderate
Check the weather before we start filming
4
Local wildlife may attack
2
3
Moderate
Be aware of what is around you at all times
5
Damaging equipment
3
4
High
Be careful when you are using the equipment, use it sensibly